Permit Service  Promote Your Business
Permit Service
ProMatch
Directory
Cost Report
 

Newport News Permit Service Costs & Prices - ProMatcher Cost Report

Newport News Permit Service Costs & Prices

Newport News, Virginia.  The Newport News Permit Service Cost Report is a concise report on everything you need to know about the cost of permit service in the Newport News area.

Average Permit Service Cost in Newport News


We have done a little research to find the average cost of permit service in Newport News. Here are the average costs and prices reported back to us:

Cost of Permit Services - Run or Expedite a Permit in Newport News, Virginia

$62.54 per hour (residential projects) (Range: $56.87 - $68.20)
Free Estimates from Local Pros
  Was this information helpful?

Newport News Permit Service Cost Data


Professionals in the Newport News area have provided information about how much permit service cost(s). Here are some of the individual reports:
23607, Newport News, Virginia - November 6, 2020

Permit Services - Run or Expedite a Permit

$54.96 - $65.90 per hour (residential projects)
Cost accounts for the price of construction permit expediting. Does include pickup and delivery of documents, permit application assistance and submission, and coordination with local building department to secure construction permit. Price does not take into account commercial building permits, the services of an engineer, and architectural drafting services.

Reported by:
ProMatcher Research Team
23320, Chesapeake, Virginia - November 6, 2020

Permit Services - Run or Expedite a Permit

$69.86 - $83.78 per hour (residential projects)
Labor is included in this permit expediting services price quote. Includes researching local codes, preparing the permit application, submitting necessary documents for the proposed work, and assistance with approvals and inspections. Cost does not account for commercial projects, engineering fees, and blueprint drafting or design services.

Reported by:
ProMatcher Research Team
23450, Virginia Beach, Virginia - November 6, 2020

Permit Services - Run or Expedite a Permit

$55.45 - $66.49 per hour (residential projects)
Price range takes into account permit expediting services labor. Accounts for the price of researching local codes, preparing the permit application, submitting necessary documents for the proposed work, and assistance with approvals and inspections. Excludes commercial projects, engineering fees, and blueprint drafting or design services.

Reported by:
ProMatcher Research Team
23707, Portsmouth, Virginia - November 6, 2020

Permit Services - Run or Expedite a Permit

$53.48 - $64.13 per hour (residential projects)
This should be considered a ballpark estimate for construction permit expediting. These items come standard: researching local codes, preparing the permit application, submitting necessary documents for the proposed work, and assistance with approvals and inspections. Certain items, such as consulting with an architect or engineer, drawing up plans, or securing permits for larger-scale commercial projects, are not typically included.

Reported by:
ProMatcher Research Team
23702, Portsmouth, Virginia - November 6, 2020

Permit Services - Run or Expedite a Permit

$55.94 - $67.08 per hour (residential projects)
This estimated price for construction permit expediting assumes typical conditions. The base cost tends to cover researching local codes, preparing the permit application, submitting necessary documents for the proposed work, and assistance with approvals and inspections. There is generally an increased cost for consulting with an architect or engineer, drawing up plans, or securing permits for larger-scale commercial projects.

Reported by:
ProMatcher Research Team
23670, Hampton, Virginia - November 6, 2020

Permit Services - Run or Expedite a Permit

$53.97 - $64.72 per hour (residential projects)
Cost takes into account labor. Also includes pickup and delivery of documents, permit application assistance and submission, and coordination with local building department to secure construction permit. Price does not include commercial building permits, the services of an engineer, and architectural drafting services.

Reported by:
ProMatcher Research Team
23501, Norfolk, Virginia - November 6, 2020

Permit Services - Run or Expedite a Permit

$54.46 - $65.31 per hour (residential projects)
This should be considered a ballpark estimate for permit expediting services. Most estimates include pickup and delivery of documents, permit application assistance and submission, and coordination with local building department to secure construction permit. Certain items, such as consulting with an architect or engineer, drawing up plans, or securing permits for larger-scale commercial projects, are not typically included.

Reported by:
ProMatcher Research Team
 
Free quotes from local permit services near you.

Newport News Permit Services



Submit a Permit Service Cost Report and Get Your Business Listed Here For Free!
Tell us how much you charge for your services and receive a free business listing.
Free quotes from local Permit Services
Disclaimer: Costs and prices shown on the ProMatcher site are intended to be used as general information, not as guaranteed estimates. To obtain cost information relevant to your project, request a quote or estimate from a local service provider.
Permit Service > Costs & Prices > Virginia > Newport News Permit Service Costs & Prices

Free Cost Estimates   |   Permit Services Directory   |   Permit Service Cost Report   |   Free Business Listing



All users of ProMatcher.com are subject to our terms of use.

Home   |   Articles & Videos   |   Affiliates   |   Networking Groups   |   Search by Category

Terms of Use   |   Privacy   |   Partner Network   |   Your Privacy Choices   |   About Us   |   Contact Us   |   Member Login

©2003-2024 - VentureStreet, LLC

Join Our Business Network